国产裸体美女永久免费无遮挡,无码国产69精品久久久久网站,欧美群妇大交群,被吊起来张开腿供人玩弄,国产999精品久久久久久,亚洲欧洲精品无码AV,亚洲AV永久无码精品黑人,国产无遮挡又黄又大又爽 ,亚洲日韩精品一区二区三区_少妇性饥渴无码A区免费_久久久久99精品国产片_人妻少妇久久中文字幕一区二区 ,成年人免费在线视频观看_免费人成动漫在线播放r18_永久免费人成在线直播_又长又大又粗又硬3p免费视频_成人动漫日本一区二区三区_久久精品这里只有精99品_最新在线精品国自av_欧美精品免费专区在线观看

Hello, welcome to visit Shandong Linyi Kuntai Machinery Equipment Co., Ltd official website!
13583992199 13562968979
Shandong Linyi Kuntai Machinery Equipment Co., Ltd
HOT KEY WORDS:used ball mill,used crusher,NE elevator,old ball mill
Loading......
Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014/7/29 18:16:55 Read: 3596 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
军事| 祁门县| 榆林市| 盐山县| 青海省| 赫章县| 玛多县| 南江县| 贵阳市| 明光市| 安庆市| 托里县| 呼图壁县| 延长县| 丰县| 武穴市| 永福县| 石河子市| 姚安县| 平顺县| 兴业县| 安陆市| 新竹市| 桐城市| 乌鲁木齐县| 宁夏| 陇西县| 满洲里市| 道真| 舒兰市| 手游| 神木县| 海伦市| 武鸣县| 五原县| 镇巴县| 运城市| 岫岩| 故城县| 五河县| 江陵县|